St. James Bay Phase 1B |
| |
|
 |
Carrabelle Properties |
| |
|
 |
Baskerville-Donovan |
| |
|
 |
$1.9 million |
| |
|
 |
Installation of 17,355 square yards of 1 1/2 “ type s-1 asphalt, 12,479 lf of type F curb & gutter on site as well as water distribution system that consisted of 2,125 lf of 6” potable water main, 5,550 lf of 8” potable water main, and all other necessary appurtenances. Wastewater collection system included 6,018 lf of 8” PVC pipe, 4” sewer lateral w/ cleanout. Storm water management system included 2,020 lf of 18” RCP pipe, 2,701 lf of 24” RCP pipe, 383 lf of 30” RCP pipe, and 169 lf of 36” RCP pipe. |
|
|
|
|
|
|